welcome,guest
Negotiable
The date of payment from buyers deliver within days
Beijing
Long-term effective
2017-12-27 08:26
205
Company Profile
Chongqing Tengtian Group.By certification [File Integrity]
Contact: tengtian(Ms.)
Telephone:
Area: Beijing
Address: Beijing
Website: http://tengtian.yuxuan-sh.com/
unit price:Negotiable
unit price:Negotiable
unit price:Negotiable
unit price:Negotiable
unit price:Negotiable
unit price:Negotiable
Chongqing tengtian group | ||
Product name | 150CC engine trimoto | |
Product technical specifications(general information) | ||
Part I technical design |
Application | Cargo transport |
Design max speed | ≥60 km/hours | |
Loading capacity | 300-500 kg | |
Unladen kerb weight | 300 kg | |
Dimension | 3155x1250x1430 mm | |
Color | Red/green/yellow/black/as you choose | |
Track | 1050 mm | |
Wheel base | 2100 mm | |
Ground clearance | 160 mm | |
Brake mode | Front and back wheels, drum | |
Transmission type | Shaft drive | |
Power | 8.0 kW | |
Cool type | Water cooled | |
Min fuel consumption | 354g kW/hour | |
Fuel type | gasoline | |
Fuel tank capacity | 12 L | |
Part II engine details |
Engine type | Single cylinder,4-stroke,camshaft downward |
Bore stroke | 63.5x49.5mm | |
Fuel type | Gasoline | |
Compression ratio | 9.5:1 | |
Rated power and rotating speed | 8.0 kW /8000rpm | |
Max torgue/rotating speed | 11.0N.m /6500rpm | |
Lowest No-Load Speed Stability | 1500rpm | |
Displacement(cc) | 156ml | |
Ignition System | CDI | |
Apply to | Motor tricycle | |
Starter | Kick/electric | |
Part III operation |
Starting System | Electric/kick |
Transmission | 5 Forward and 1 reserve gears | |
Gearshift control | Manual-foot | |
Clutch method | Manual-hand | |
Brake operate mode | Manual-hand or foot | |
Part IV packing |
Transport | By Land/Sea/Other |
Port of loading | Chongqing/Shanghai/other ports of China | |
original manufacturer | Chongqing tengtian technological develop company limited | |
Packing | SKD, CKD, CBU | |
Loading capacity (CKD) | 22 units in 20"GP,54 units in 40"HQ | |
Delivery time (from loading port) | 20-25days after receiving advance payment |